Uudised

DM40 Drilling Machine Chassis Replacement Installation

Dec 05, 2023 Jäta sõnum

      As shown in Figure 1, before installing and replacing the base of the drill press, you need to check whether the magnetic suction (Figure 1 ④) is in the state of magnetization and the safety pin has been locked (it must be magnetized on the inclined plane and then lifted to install the equipment); install the lifting rings (Figure 1 ③) on both sides of the bed of the drill press (Figure 1 ②), and then use lifting operation to lift the magnetic suction base (Figure 1 ①), and then use the socket head screws to tighten the installation of the drill press and the base. (c) The drill press is mounted on the magnetic base (Figure 1 ①) by lifting.

The flat base (Figure 2 ⑤) is directly locked on the workpiece plane, and the same lifting method is used to install it when replacing the base; choose the base installation according to the actual situation.

news-258-510news-199-463

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 1 Magnetic base mounting                                                                                                          Figure 2 Flatbed base mounting

Küsi pakkumist